Stop load emulation. Results received during the test execution period are available.
GET URI
/StressTest/{id}/StopLoad
Refer to StressHistory_Seq_ID to select the test ID.
Example of a Successful Response
200 OK
Stop load emulation. Results received during the test execution period are available.
/StressTest/{id}/StopLoad
Refer to StressHistory_Seq_ID to select the test ID.
200 OK