According to the information from FL, USA location ISP:
“Vault Networks will be conducting server rack migrations, network infrastructure
upgrades, and power infrastructure upgrades to the Miami Dedicated Servers.
These upgrades will allow us to offer increased capacity, increased reliability,
additional functionality, and support a broader range of services.
Each Dedicated Server will have a SINGLE working session during ONE of the
maintenance window intervals listed below. Servers will be migrated from their
current location to a new rack. Customer services will be interrupted during the
working session for approximately 2-3 hours between 12:01am and 6:00am EST.
Start Date/Time – 7/19/2016 @ 12:01 am EST
End Date/Time – 7/19/2016 @ 6:00 am EST
Start Date/Time – 7/20/2016 @ 12:01 am EST
End Date/Time – 7/20/2016 @ 6:00 am EST
Start Date/Time – 7/21/2016 @ 12:01 am EST
End Date/Time – 7/21/2016 @ 6:00 am EST
While we have taken every precaution to minimize complications during this
event, there exists a certain amount of risk and the possibility of extended
service disruptions.
Sincerely,
-The Vault Networks Team.”
Monitoring from FL, USA location might be unavailable during mentioned intervals.